The Hindu
AsiaPac · 3 hrs ago
Upper Bhadra Project: Trial run to Chitradurga branch canal begins
Three TMC of water is being released as part of the trial run, launched at the project’s intake point on the Bhadra reservoir
Do you trust The Hindu?
Sign in to rate
Discussion
?
No comments yet — be the first to start the discussion!