Romania Insider
Europe · 22 mins ago
Market incentives and rising installed RES-E capacity encourage more BESS investment in Romania
03 September 2026 During August, the power output capacity of Romania’s BESS installations increased by 100 MW, while their storage capacity rose by 335 MWh, indicating significant expansion and a shift towards equipment with longer discharge durations. At the end of the month, Romania reached 1,094 MW of installed BESS power capacity and 2,310 MWh of storage capacity, Economica.net reported. The largest storage facility to enter commercial operation last month was the 160 MWh Glodeni 3 battery, operated by Energyglod, owned by businessman Claudiu Șugar. The largest battery in Romania is the 400 MWh facility in Florești, Cluj County, operated by Nova Power and Gas, part of the Romanian group E-Infra, which is currently the market leader in terms of installed storage capacity. It is followe
Do you trust Romania Insider?
Sign in to rate
Discussion
?
No comments yet — be the first to start the discussion!