MyJoyOnline
Africa · 11 mins ago
Kumasi to experience intermittent power outages for three months as GRIDCo upgrades transmission lines
The Minister for Energy and Green Transition, John Abdulai Jinapor, has announced that residents of Kumasi and parts of the Ashanti Region should brace for intermittent power outages over the next three months as the Ghana Grid Company Limited (GRIDCo) undertakes a major rehabilitation of ageing power transmission infrastructure.
Do you trust MyJoyOnline?
Sign in to rate
Discussion
?
No comments yet — be the first to start the discussion!