The Hindu
AsiaPac · 23 mins ago
Eravipuram railway station development works to finish by January 2027
The master plan for the station includes upgrading both platform 1 and platform 2 to a standard height of 84 cm, alongside extending their length on either side
Do you trust The Hindu?
Sign in to rate
Discussion
?
No comments yet — be the first to start the discussion!