MyJoyOnline
MyJoyOnline
Africa · 8 mins ago

Accra-Tema Motorway reconstruction 48% complete with drainage works reducing flooding

The reconstruction of the Accra-Tema Motorway is 48% complete, with major drainage infrastructure already helping to reduce flooding along the corridor, according to road construction consultant Ing. Kwabena Bempong. Ing. Bempong said work is currently focused on the urban highway, which will function as a service road alongside the main motorway.
MyJoyOnline
Do you trust MyJoyOnline?
Sign in to rate
Discussion
?

No comments yet — be the first to start the discussion!